Septic Permit – Type I Systems
Holding Tank - Type II Systems
Other Systems – Type III, VI, V Systems (Monitoring and Mitigation)
Soil Verification
Re-inspection fee
SSTS Ordinance
Operating Permit

Septic System Permit Requirements:

1. Completed Land Use Permit Application 
2. Completed Septic Design by a Licensed Designer
3. McLeod County SSTS Design Summary Sheet (Signed By Designer & Installer)
4. Soil Verification
5. Management Plan
6. Floor Plans of the Dwelling
7. Other forms that are required – Contact Environmental Services for requirements

Downloadable Files:
Admin Permit App 48/24 Hour
Admin Permit App Special 2 Month